2018
Project Description | Owner / End User |
---|---|
Repair works for Kingfisher Telemetry Systems at Klang, Hulu Langat Sepang Region | Syarikat Bekalan Air Selangor Sdn Bhd |
Kerja-kerja membekal, memasang dan menguji satu (1) electromagnetic (EM) flowmeter di Loji Air Bertam | Syarikat Air Melaka Berhad |
Kerja-kerja penyelenggaraan berjadual (preventive maintenance) Sistem SCADA Loji Air DAF II dan Loji Air Bertam I & II bagi tempoh tiga (3) tahun | Syarikat Air Melaka Berhad |
The proposed construction and completion of Ganchong Water Treatment Works, main distribution pipeline, booster pump stations and associated works in Pekan, Pahang Darul Makmur for the East Coast Economic region development council (ECERDC) – Package 3A: Main distribution pipeline, main buildings and associated works at Tg. Agas | Taliworks Construction S/B |
Package 1A – Supply, delivery, installation, testing and commissioning of New Scada System at Air Selangor Group of Companies’ Water Treatment Plant (WTPS) | PNSB Water Sdn Bhd |
Instruments integration works at Langat Water Treatment Plant | PNSB Water Sdn Bhd |
Merekabentuk, membina, menyiapkan, mengujilari mentauliahkan kerja-kerja mekanikal dan elektrikal serta kerja-kerja berkaitan (reka bina) untuk Skim Bekalan Air Merbau Condong Fasa II (Pakej 1), Jajahan Machang, Kelantan Darul Ehsan | Air Kelantan/ Cdah Construction |
Package 1 Sludge Treatment facility rehabilitation works for Bukit Tampoi | Trinipac Sdn Bhd |
Proposed development of Langat 2 Water Treatment Plant and Water Reticulation System in Selangor Darul Ehsan / Wilayah Persekutuan Kuala Lumpur – Pakej 7: Membina dan menyiapkan Kolam Air Imbangan Hulu Langat berkapasiti 92 Juta Liter | Taliworks Construction |
Supply, deliver, install, testing and commissioning Early Warning System for Network Pumping Station No.1 to No.5. – Pakej D43 – Pembinaan Rangkaian Paip Pembetungan Di Batu, Jinjang Kepong, Kuala Lumpur | Teknoserv Eng S/B |