2007
Project Description | Owner / End User |
---|---|
Instrumentation and telemetry system for Bukit Serampang water treatment plant, New Raw Water Intake, Muar, Johore | SAJ/ Ranhill |
Instrumentation and telemetry system for Pakej 3 – Membekal, memasang, mengujiterima dan mentauliah pam penggalak termasuk kerja-kerja M & E di Bukit Besi Dungun, Terengganu | SATU/ HLA |
Scada and telemetry enchancement works of the 33kV, 6.0kV and 415V switchgear, reservoir valves and other related works at Sg. Semenyih water treatment plant | ABASS Konsortium |
Scada and Telemetry System for Hulu Terengganu Water Supply Scheme Stage 2 at Jerangau Water Treatment Plant, Terengganu | SATU/BW PERUDING |
Cadangan projek perumahan (Fasa 1) ai atas sebahagian Lot 5068 dan tanah kerajaan berhampiran Kg. Permata Kuang, Mukim Rawang Daerah Gombak, Selangor untuk Tetuan Konsortium SKS Bhd | SYABAS |
The proposed construction and completion of water reticulation works for the connection of existing 1200mm diameter mild steel R1 pumping main to reservoir R3 as part of main insfrastucture works, Bandar Nusajaya, Johor | SAJ/ Ranhill |
Kerja-kerja penggantian peralatan telemetri dan konfigurasi system Scada Loji Pembersihan Air Sg. Semenyih | Konsortium Abass/ SMHB |